Data Centers
From site preparation to continuous operation
AI data centers integrate high-performance servers and GPUs with cooling, power and network infrastructure for generative AI training and inference.

- 19%
Data centre outages caused by cooling
- 30%+
Cooling share of power in less efficient data centres
- 66B litres
Direct water use by US data centres in 2023
What is the data center industry?
The data center industry builds servers, power and cooling equipment for large-scale computing in one place and operates them without interruption. As compute density has risen, so has heat, and cooling has widened from air to circulating liquids and immersing equipment in fluid. Fluids sit next to energized equipment and thermal materials fill the gap between chips and cold plates, so cooling fluids with insulation and flame resistance, thermal interface materials, pipe sealing and system water quality management interlock within one system.
Data center risk comes from the condition that nothing may stop. When cooling fluid oxidizes or absorbs moisture, insulation performance drops, and when boards, seals and thermal materials immersed in fluid swell or leach, the whole installation is at risk. Material compatibility, insulation and flame properties, behavior when mixed with existing fluid and disposal routes for spent fluid are reviewed alongside cooling performance. Specifications in data centers are fixed at the design stage, so joining the discussion before the building goes up leaves room for choice.
- 01
Site selection and civil works
A site is chosen and prepared based on power capacity, cooling water supply and area. Piping, structural steel and power equipment left outdoors for long periods rust. Choose rust preventives by protection period, outdoor exposure and application method.
- 02
Modular and prefab rack and piping assembly
Cold plates, server racks and piping are assembled, then pressure and leak tested. Closing the loop with machining oil and debris inside lets debris block heat exchange surfaces. Choose cleaning and flushing products by cleaning power, pipe and seal fit and residue.
- 03
Applying thermal interface materials at chip and server level
Thermally conductive adhesive and gap filler are applied between chips and cold plates to give heat a path out. In immersion environments, silicone paste can dissolve or swell, leading to chip damage and fluid contamination. Choose thermal materials by thermal conductivity and swelling and dissolution behavior in the fluid.
- 04
Cooling fluid filling
Immersion cooling fluid or coolant is filled on site into assembled tanks and piping. Moisture or debris mixed in during filling breaks down insulation. Choose fluid by cooling performance, dielectric breakdown voltage and flame properties.
- 05
On-site installation and piping connection
Modules are moved and fixed, cooling, power and network are connected and joints are sealed. One leaking joint can let fluid escape into soil and water. Choose sealants and grease by sealing performance, fluid compatibility and ease of rework.
- 06
Continuous GPU and server operation
Cooling and power are supplied nonstop under heavy heat loads. Oxidized or wet cooling fluid loses insulation. Choose fluids and water treatment chemicals by cooling, material compatibility and dielectric properties.
- 07
Fluid sampling and quality analysis
Oxidation, moisture and insulation performance of operating cooling fluid are sampled and checked regularly. Late detection of oxidation and moisture grows into insulation incidents. Choose analysis items by method, criteria and turnaround.
- 08
Maintenance and part replacement
Servers are lifted out and remounted, thermal materials are reapplied and fluid and parts are topped up. Discontinued or mixed fluids perform differently. Choose substitutes by cooling and insulation, mixing behavior and inventory and lead time.
- 09
Coolant disposal and replacement
Immersion cooling fluid and coolant at end of life are recovered for treatment and replaced with new fluid. Delays in hazard classification of spent fluid raise treatment costs sharply. Choose fluid by performance in use, disposal route and flushing at replacement.
- 10
Risk assessment and insurance
Cooling system failure and disaster scenarios are reviewed and safety data on chemicals used is organized. Inconsistent documents for operators and insurers lengthen reviews. Choose fire-stop sealants by fire rating, test history and current registration.
Regulation and certification
ASHRAE TC 9.9 guidelines
Data centre guidelines from ASHRAE committee TC 9.9, covering temperature and humidity ranges for IT equipment and coolant management in liquid cooling. They inform the choice of coolant additives and pipe cleaners.
OCP immersion cooling requirements
Requirements for immersion cooling systems and fluids published by the Open Compute Project. Cooling fluids are checked against them for compatibility with server materials, dielectric properties and flammability.
NFPA 75
The US fire protection standard for information technology equipment and the rooms that house it. Cooling fluids, cleaners and coatings kept in IT rooms are reviewed for flammability and combustion behaviour against it.
Uptime Institute Tier
A rating system for the redundancy and concurrent maintainability of data centre infrastructure. Where maintenance must happen during operation, topping up or changing cooling chemicals and generator oils is planned without stopping service.
FAQ
Moving to immersion cooling, can we keep using our silicone thermal paste?
It is often hard to keep using it. In some cases silicone paste swelled or leached in immersion fluid, raising chip temperature and contaminating the fluid. The same paste behaves differently depending on fluid type.
A quick way to judge is to soak the material in the fluid you will actually use and watch for changes in weight, volume and fluid color. If changes appear even over a short period, they are likely to widen further in long-term operation.
Cooling water heat exchange is slowly declining. How do we narrow the cause?
Scale or slime building up is often the cause. Early on it does not show clearly in numbers and tends to appear as a gradually widening difference between inlet and outlet temperatures.
Scale and slime call for different fixes, so tightening water quality control alone leaves slime, and adding only biocide leaves scale. Cycles of concentration in cooling tower makeup water are also involved, so changing only chemicals while leaving concentration conditions as they are can bring the problem back in the same place a few months later.
When switching to a different cooling fluid, can we mix it in as a top-up?
Some combinations can be mixed and some cannot. With different base oil families, additives can react to form precipitates or give unexpected insulation performance.
One way to check is to mix small amounts of the two fluids, leave them for a few days and look for haze, precipitation and layer separation. To get by with topping up, first check whether the base oils and additive families of the two products are in the same line. For combinations without mixing data, flushing the system and replacing all fluid is safer.
What is a suitable interval for fluid analysis?
It depends on equipment conditions, but sampling closely at first and lengthening intervals once values stabilize tends to work well. In early operation, piping residue and moisture come in together, so values often waver.
When lengthening intervals, it is good to record the basis for doing so. If a problem arises in a widened gap, there are no values in between to trace the cause, and insurance reviews sometimes look at management history. Changing the sampling location also breaks continuity with earlier values.
We are told cooling chemistry should be decided at the design stage. Why?
Once the fluid type is set, pipe materials, seals, thermal materials and leak containment equipment follow from it. Changing fluid after the building and piping are up often means reworking surrounding specifications.
Changing fluid after operation starts means reworking piping, seals and thermal materials too, so costs rise on a different scale from initial selection. That is why some, rather than fixing on one candidate at design, keep two or so products in the same family that can substitute for each other.
What data does an immersion fluid need to pass review?
Insulation and fire safety data are often looked at first. Dielectric breakdown voltage, dielectric properties, flash point and combustion data are the basics, along with test history against immersion requirements.
Required data differs between single-phase and two-phase applications, and even for the same product, reports issued under different conditions are hard to use as is. Operators and insurers also each review the same data, so if data is not prepared as one consistent set, adoption can be delayed even after performance review is done.
How is spent immersion cooling fluid disposed of?
As a rule it is treated under designated waste standards, and treatment route and cost differ greatly with the hazard classification. If classification is delayed, stored volume piles up and the burden grows.
Because treatment cost depends on the classification result, the operating cost set when the fluid was brought in can differ from actual cost at replacement. If the treatment contractor has not handled that fluid type before, volume is sent out in portions, increasing both storage burden and replacement time.
How do we stop rust on piping and steel left outdoors during construction?
Methods differ with exposure period and storage form. For materials left briefly, covering with rust preventive oil or rust preventive is simple; for materials waiting long, adding VCI packaging is often better.
On construction sites, materials are often taken out and covered again, and the more often packaging is opened and closed, the shorter protection lasts. For materials without a set dispatch date, some sites split packaging into smaller units to open as needed. Whether the product needs removal right before installation is also decided before materials arrive.