How AI data centers are changing the market for cooling chemicals

Type
Kaltec Voices
Published
24 November 2026
Prepared by
Minkyung Choi
Role
Research Analyst

As the heat from AI racks passes the point air can handle, cooling chemicals move into the secondary coolant loop right behind the chip, and when racks arrive filled, the formulation is set at first fill in the rack factory before the building stands. The spec sets the supplier's duties but leaves open who aligns fluids across loops and reads the analyses to decide top-ups, so purchasing plans should follow the lag from grid wait to operation and cover the whole loop together.

Background

In Uptime Institute's 2026 survey, the rack density operators gave most often passed 11 kW for the first time, up from 9 kW a year earlier (Kerner, 2026). An AI rack that ties together 72 GPUs draws 120 kW (Hamilton, 2025), and in its March 2025 roadmap the GPU maker announced 600 kW racks for late 2027 (Mann, 2025). In July 2026 an analysis report said that rack would slip to 2028 (Constantin, 2026). The International Energy Agency put the world's data center electricity use at 485 TWh in 2025 and expects about 950 TWh in 2030. It found that consumption by AI-focused data centers grew 50% in 2025 alone and expects it to triple by 2030 (IEA, 2026).

As total electricity grows, the number of buildings grows. When the heat of a single rack passes the point air can cool, the medium that carries the heat changes. Cooling chemicals follow this second change into the coolant loop right behind the chip. I see the coolant in this loop not as an item bought once, but as a process that starts with first fill at the rack factory and runs on for years of cleaning, analysis and inhibitor top-ups. So to see this market, you have to ask not only how much sells but when, and in which factory, the formulation is set.

The secondary coolant loop, right behind the chip

The GPU maker explains that cooling a 120 kW rack with air would take sub-zero air or airflow close to gale speed (Hamilton, 2025). So AI racks use direct-to-chip cooling, with metal cold plates on the chips and liquid flowing through them. Chip heat passes into the coolant of the rack-side secondary loop, then into the building's facility water at the heat exchanger in the coolant distribution unit. The two liquids never mix.

Market forecasts center on this method too. Dell'Oro estimated that the data center liquid cooling market roughly doubled in 2025 to close to 3 billion dollars and will reach about 7 billion by 2029. It sees single-phase direct-to-chip cooling staying the mainstay for AI clusters, and two-phase cooling, where coolant boils on the chip to carry heat, staying in pilots and early large builds until chip heat outgrows single-phase limits. Immersion cooling, which submerges servers in fluid, remains a selective choice (Cordovil, 2026). These figures are cooling equipment makers' revenue, so the coolant's own share is not visible. That is why I count the chemicals' share in the years of care after installation.

The coolant for the secondary loop has a public standard. The guideline the Open Compute Project issued in September 2026 takes PG25, 24.5 to 27.5% propylene glycol by volume, as its reference, with the remaining 75% or so being water and inhibitors (OCP, 2026a). Glycol itself is a commodity chemical. A coolant's value is decided by the inhibitor formulation that protects copper cold plates and stainless piping together in one loop, and by the purity of the dilution water.

First fill ties up years of chemicals

Corrosion inhibitors are slowly used up as they form a protective film on metal surfaces. The guideline says that when analysis shows depletion, top-ups should use only additives approved by the original coolant supplier, because unapproved additives or overdosing can lead to precipitation, clogging, poorer heat transfer and faster corrosion (OCP, 2026a). The PG25 base spec issued in July 2026 backs this as a supplier duty. The original maker must offer a replenishment additive package, a concentrate of the same additives for when glycol dilutes below 25%, and an analysis service from sample intake to interpretation of results (OCP, 2026b).

The same spec holds two sentences that seem to pull against each other. It says it widens the supply chain by reducing reliance on a single formulation, yet states firmly that coolants from different suppliers that pass the spec are not therefore interchangeable (OCP, 2026b). Across the market, sources multiply. For any one loop, the first-fill formulation holds for years.

First fill happens earlier than most people think. The guideline recommends using the same coolant through design, manufacturing, testing and cleaning, and says equipment holding a fluid other than the operating fluid should be flushed and refilled with the operating fluid before it comes in. For small loops under 100 gallons, about 380 liters, glycol concentration and pH must be checked for each rack before or during startup, and it adds that the rack maker may take on that check (OCP, 2026a).

How much this weighs depends on how racks arrive. If racks ship filled with coolant, both the volume and the formulation of first fill are set at the assembly plant. If the fluid is drained after factory testing, the racks are filled fresh on site, but leftover fluid that differs from the site's operating fluid means another flush, so the formulation family still has to match the factory test fluid. When the assembly plant is overseas and racks arrive filled, what local purchasing can reach narrows to cleaning, top-ups and analysis. The builds I have seen had both cases. The first inquiries about secondary loop coolant, inhibitors and analysis also came from those who assemble and test racks and cooling units, and operators' inquiries came later. There were more of them than inquiries about immersion tanks.

What the spec leaves open

Items that go into the secondary loop split by purchase cycle. Cleaning solutions and rinse fluids for the piping, and the first-fill fluid, go in once per loop. The guideline says to record cleaning methods, chemicals and results, and before site cleaning, to confirm the cleaning the component maker already did at the factory. Filters go into factory filling and the loop's side-stream filtration, analysis comes at least yearly, and top-up additives come at the rate inhibitors deplete (OCP, 2026a).

Of these, the base spec binds the coolant, its top-ups and analysis as supplier duties, and states that system-level design is out of scope (OCP, 2026b). The guideline also leaves the facility water beyond the heat exchanger out of scope (OCP, 2026a). So some jobs fall into no one's duties. If racks from different makers arrive at one site, each tested at its factory with a different PG25, the spec does not say which fluid becomes the site's operating fluid or which racks get flushed. Suppliers interpret analysis results, but reading the results of dozens of loops against one standard and deciding which loop gets a top-up and when is up to the operator. On whether cleaning residue is compatible with the inhibitor, the guideline only says to confirm with the cleaning chemical supplier, without saying who should do it (OCP, 2026a).

These gaps show when a different buyer handles each stage. I have seen many sites split this way: the piping contractor handles cleaning, the rack maker first fill, and the operator analysis and top-ups. On such sites, whether the first-fill lot and the later top-up additives belong to the same family is in no one's purchase specification. Because the spec allows each supplier its own inhibitor formulation (OCP, 2026b), this check cannot be skipped even between fluids that pass the same spec.

Putting it to work

In Korea's power grid impact assessment, piloted from August 2024, data center sites came to 28 cases and 1.9 GW in the capital region and 64 cases and 7 GW outside it, and from November 16, 2026, the passing score for capital region data centers rose from 70 to 75 points (ETNews, 2026). I treat these counts as a leading signal of construction starts, but since they include applications meant to lock in power first, I count only part of them as starts. When turning megawatts into chemical demand, I count twice. First-fill volume is set once, as megawatts times secondary loop fluid volume per megawatt, and yearly top-up volume is set each year, as that first-fill volume times a yearly top-up rate. Fluid volume varies with rack design and piping length, so I take both factors from cases I have seen.

StageTiming and reference pointWhat the purchasing plan does
Announcement and grid waitGrid connection wait, averaging more than four years in major markets (JLL, 2026); this wait drives the start dateAdd region and megawatts to the demand count and estimate the direct-to-chip share
Construction start to operation2 to 3 years (IEA, 2025)Set the piping material list, cleaning method and site operating fluid together
First fill at the rack factoryDuring construction, a few months before completionMatch factory test fluid to the site operating fluid; get lot samples and cleaning records
CommissioningRight after completionBaseline sample analysis; record fluid volume per loop
OperationYears after startupSize top-up chemical stock from analysis results; get top-up additives, concentrate, filters and analysis from one supply

Analysis frequency in the operation row depends on loop risk. The guideline recommends analyzing medium-risk loops, those with no inline monitoring and operators unfamiliar with coolant, every six months for a year and a half after commissioning. Low-risk loops with monitoring are analyzed yearly, and high-risk loops, where some wetted materials are less compatible, quarterly (OCP, 2026a).

In this table, operation is the stage where chemicals go in longest, but its formulation is set at the rack factory, and the spec leaves the link between the two open. So when choosing the supply for this loop, spec compliance is the starting point, and three jobs remain after it: checking each incoming rack's factory test fluid and cleaning records and matching them to the site operating fluid, reading the analyses of many loops against one standard and setting top-up timing, and supplying everything from cleaning solution to top-up additive in one formulation family.

Conclusion

AI data centers raise the volume of cooling chemicals, but they change the shape of the trade even more. Secondary loop coolant becomes a process of analysis and top-ups that follows the first-fill formulation for years, and at sites where racks arrive filled, the entrance to that process already sits in the rack factory.

Going forward, secondary loop chemicals at direct-to-chip sites in Korea will also be contracted together with first fill at the rack factory.

Sources

  • Constantin, A. M. (2026). Nvidia's Kyber AI rack slips to 2028, and one circuit board is to blame. The Next Web, July 6, 2026, citing SemiAnalysis analysis. https://thenextweb.com/news/nvidia-kyber-rack-delay-2028
  • Cordovil, A. (2026). Data center liquid cooling market to approach $7 billion by 2029 as AI deployments accelerate. Dell'Oro Group, January 8, 2026. https://www.delloro.com/news/data-center-liquid-cooling-market-to-approach-7-billion-by-2029-as-ai-deployments-accelerate/
  • Electronic Times [ETNews]. (2026). 데이터센터 수도권 진입장벽 더 높인다 [Barriers to data centers in the capital region rise further], November 15, 2026, on power grid impact assessment pilot siting figures and the notice effective November 16. https://www.etnews.com/20261113000210
  • Hamilton, M. (2025). Chill Factor: NVIDIA Blackwell Platform Boosts Water Efficiency by Over 300x. NVIDIA Blog, April 22, 2025. https://blogs.nvidia.com/blog/blackwell-platform-water-efficiency-liquid-cooling-data-centers/
  • International Energy Agency [IEA]. (2025). Energy and AI: Energy demand from AI, April 2025. https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai
  • International Energy Agency [IEA]. (2026). Key Questions on Energy and AI: Executive summary, April 16, 2026. https://www.iea.org/reports/key-questions-on-energy-and-ai/executive-summary
  • JLL. (2026). 2026 Global Data Center Market Outlook, January 5, 2026. https://www.jll.com/en-us/insights/global-data-center-outlook
  • Kerner, S. M. (2026). AI Drives Data Center Uncertainty in Uptime's 2026 Survey. Data Center Knowledge, July 31, 2026, on the Uptime Institute Global Data Center Survey 2026. https://www.datacenterknowledge.com/ai-data-centers/ai-drives-data-center-uncertainty-in-uptime-s-2026-survey
  • Mann, T. (2025). Nvidia's Vera Rubin CPU, GPU roadmap charts course for hot-hot-hot 600 kW racks. The Register, March 19, 2025. https://www.theregister.com/2025/03/19/nvidia_charts_course_for_600kw
  • Open Compute Project [OCP]. (2026a). Guidelines for Using Propylene Glycol-Based Heat Transfer Fluids in Liquid Cooled Racks, Revision 2.0, Version 1.0.0, September 15, 2026. https://www.opencompute.org/wp-content/uploads/2026/10/OCP-PG25-Guidelines-V1.0.0.pdf
  • Open Compute Project [OCP]. (2026b). Base Specification for Single-Phase Propylene Glycol-Based Cold Plate Coolants (PG 25), Version 1.0.0, July 14, 2026. https://www.opencompute.org/documents/ocp-base-specification-pg25-v1-0-0-final-pdf/

Product and site consultation

Leave your company, site and the product groups in use. Our engineer will get in touch to go through your site conditions and concerns. Materials, equipment, operating conditions and downstream steps show what should change and what can stay. If nothing needs to change, we will say so.

Contact us
After you contact us
  1. 01
    Site setup

    We confirm process conditions and needs first.

  2. 02
    Spec design

    We set the product spec and selection criteria.

  3. 03
    Comparison

    We compare matching candidates and propose.

  4. 04
    Tailored supply

    We supply on time and manage the stock.

  5. 05
    Site check

    We visit, check conditions of use and record.

  6. 06
    Use management

    We track use and change cycles to catch issues.

  7. 07
    Regular analysis

    We analyze the records and send a yearly report.