New fabs rising in the US, Japan and Europe reopen qualification even for materials already approved at home, and how much reopens depends on whether the material is made locally, replaced by a local substitute, or still shipped from home. Whichever path a material takes, how fast qualification closes again depends on records of the earlier site's approvals and of what differs between the two plants.

Background

A few years ago, a customer announced it would build a new fab overseas. That quarter, the sources of items we supplied to that customer asked one after another whether their current approval would carry over to the new fab. Each source's situation was different. One planned to build a plant near the fab, one meant to keep shipping from Korea, and another was likely to give way to a local maker's product. Same fab, same group of items, and the qualification that would reopen split three ways in size.

Between 2024 and 2029, new fabs go up one after another in the US, Japan and Europe. A material approved at the home fab is, once made in another plant, a material the customer has never seen. Even shipped from the same plant, it goes through process evaluation again if the new fab runs a different process generation. So when news of a new fab breaks, I first work out which of the three paths each item headed there will take. The path decides how much qualification reopens, and how fast it closes again depends on where, and in what records, the earlier approvals are kept.

A new fab's schedule becomes the qualification schedule

In the US, TSMC's first Arizona fab has been in volume production since late 2024. In March 2025 the company raised its US investment to $165 billion and said it would build three more fabs and two advanced packaging plants (TSMC, 2025). Samsung's fab in Taylor, Texas, aims to start trial runs as early as December 2026 and full volume production in 2027 (Korea Herald, 2026). In Kumamoto, Japan, TSMC's joint venture JASM began volume production at its first fab in December 2024 (SiliconANGLE, 2024). The second fab next to it won Taiwan government approval in March 2026 and switched its plan to a 3-nanometer process (Focus Taiwan, 2026). In Dresden, ESMC, a joint venture of TSMC, Bosch, Infineon and NXP, broke ground on a 10 billion euro fab in August 2024. The same day the European Commission approved 5 billion euros of German state aid, and production is to start in 2027 and reach 40,000 wafers a month by the end of 2029 (GTAI, 2024).

Line up the production dates and Arizona and Kumamoto start in late 2024, Taylor and Dresden in 2027, followed by more Arizona fabs and Kumamoto's second. The production years bunch in pairs in late 2024 and 2027, but qualification opens earlier, around tool move-in, so the materials work runs year after year in between. That is why the first signal I watch is tool move-in. In the quarter the tools arrive and test wafers start running, process evaluation of the materials opens.

Materials plants have to move even earlier. One Korean materials company set up a US subsidiary in Texas in June 2022 and put about 260 billion won into facilities for photoresist thinner and high-purity sulfuric acid (Herald, 2026). In November 2025 the company said it planned to ship evaluation samples of thinner from the second quarter of 2026 (Asiae, 2025). On that plan, it is four years from founding the subsidiary to evaluation samples, and a year or so more before those samples reach volume production at the Taylor fab. When a fab's plan changes, this timetable shakes too. When the process generation changes, as at Kumamoto's second fab, the specs for lithography, etch and cleaning materials change with it, and part of the qualification prepared for the first plan has to be redone.

Same product name, new site, another look

The chip industry's strictness about production sites has an old basis. In 1998 Intel described its Copy EXACTLY! method: when a process moved from the development line to a volume fab, tools and their installation were copied down to pipe diameters and the number of bends, and even a supplier change came in only through the development line (McDonald, 1998). A chip company that matches its own fabs this closely does not let a change in the plant a material comes from slide. A site change falls under change notification in the supply contract, and product from the new plant does not enter the line until the customer approves it. One hydrogen peroxide producer stresses that it runs the same manufacturing process at its plants in Europe, the US and Asia (Solvay, 2026). Even so, the customer fab analyzes lots from the new plant, runs them through tools, puts them into some product lots to watch yield, and only then approves. A claim of running the same process does not replace qualification. It only gives grounds to narrow what gets looked at again.

There are few public numbers on how long qualification takes. A June 2026 trade press piece by an executive at a supply chain consultancy said suppliers who prepared ahead were cutting qualification that once took 18 months down to 90 days. He traced the difference to running operational readiness in parallel before the contract was even won (Ottley, 2026). Some of the time does not shrink with readiness. The scope a customer looks at again narrows only when what is already known and what has changed are separated. Depth also differs by item. Unlike process chemicals that touch the wafer, fluids used in tools, such as lubricants, often stop at incoming review and the tool maker's approved list without going as far as yield evaluation.

Local sourcing targets change the path

A supplier cannot pick the path alone. At a semiconductor trade show in December 2023, JASM's president gave the share of equipment and materials for the Kumamoto fab bought from Japanese suppliers. It was about 25% then, with targets of 50% for 2026 and 60% for 2030 (Digitimes, 2023). An item from a Japanese supplier coming in for the first time reopens qualification from document review. An item from the Japan plant of a supplier already approved at Taiwan fabs reopens it from the differences between the two plants. In the US, each company that received CHIPS Act support is building a domestic supply base. Even so, of the more than 200 key chemical inputs an advanced fab needs, many still have no semiconductor-grade production inside the US (Ottley, 2026). Those items will have to cross the ocean for now.

Whether an item can stand the long trip differs from item to item. The hydrogen peroxide producer above wrote that ultra-high-purity hydrogen peroxide cannot be flown, so it builds its supply chain around capacity close to fabs (Solvay, 2026). For small-volume items that store well, continuing to ship from home is the way to keep new qualification down. Among the items I follow, cases where the same product name comes from two sites grow every year. The name is the same, but each site has to go on the customer's approved list separately. A reopened qualification is a recurring cost for existing suppliers, but for suppliers outside the approved list it is also an entry point that comes once every few years.

Putting it to work

Sort a new fab's materials list into three cases, item by item, and the qualification that reopens and what the supply side should watch differ by case.

When the same material is made locally, what reopens is the difference between the two plants. What changed among raw material sources, purification and filling sets the scope to be looked at again. If the supply side offers the results of lots approved at the home fab as a baseline and states up front what differs at the new plant, the scope narrows to what differs.

When a local substitute is used, every stage opens, from document review to low-volume production use. The 18 months above reads as a figure close to this case.

When shipping continues from home, approval of the material usually carries over if the new fab moved the same process generation with the same tool set as the home fab. What reopens is mainly the route. With more days at sea, in customs and in local warehouses, and with storage conditions and shelf life changing, incoming and storage criteria are reviewed again. If the fab changes process generation, process evaluation reopens in this case too.

Once items are counted in three cases, the next supplier evaluation looks at history as much as at price and lead time. That history is which site's lots of each item were approved at which fab. A single manufacturer knows the differences between its own two plants. Where change notices and approval results from many sources arrive together, a per-site approval history builds up for each item.

Conclusion

When a new fab goes up, a material's production site or process generation changes with it, and the customer has not yet seen the changed side. So qualification reopens, the three paths decide how much, and the approval history kept by site decides how fast it closes.

If JASM's 60% target holds and semiconductor-grade production in the US comes up as slowly as it has, the new fabs of around 2030 run with local supply above half in Japan and a mix of home shipments and local production in the US, and customers' approved lists carry two site lines under the same product name.

How fast a second site for the same product name reaches the approved list turns on who holds the first site's approval history.

Sources

  • Asiae. (2025). Dongjin Semichem: "2026 Is the Turning Point"... Quantum Leap in Performance Expected with U.S. Taylor Plant Launch, Asia Business Daily, November 25, 2025, plan to ship evaluation samples from the US thinner subsidiary. https://www.asiae.co.kr/en/article/2025112514470596016
  • Digitimes. (2023). TSMC's Kumamoto fab aims to source 60% of equipment and materials from Japanese suppliers, Chiang Jen-Chieh, December 15, 2023, remarks by the JASM president at SEMICON Japan 2023. https://digitimes.com/news/a20231215PD208.html
  • Focus Taiwan. (2026). Taiwan government approves TSMC's 3nm upgrade for second Japan fab, Central News Agency, March 31, 2026. https://focustaiwan.tw/business/202603310027
  • Germany Trade & Invest [GTAI]. (2024). TSMC Breaks Ground, Secures Subsidy for German Plant, press release, August 20, 2024. https://www.gtai.de/en/meta/press/tsmc-breaks-ground-secures-subsidy-for-german-plant-1813224
  • Herald. (2026). Dongjin Semichem ramps up thinner production in US as Samsung's Taylor fab nears launch, Herald Business, Park Ji-young, September 22, 2026. https://biz.heraldcorp.com/article/10881819
  • Korea Herald. (2026). Samsung's Texas chip plant could begin trial runs in December, Moon Joon-hyun, November 8, 2026, Samsung has not confirmed the date. https://www.koreaherald.com/article/10929626
  • McDonald, C. J. (1998). The Evolution of Intel's Copy EXACTLY! Technology Transfer Method, Intel Technology Journal, Q4 1998. https://www.intel.com/content/dam/www/public/us/en/documents/research/1998-vol02-iss-4-intel-technology-journal.pdf
  • Ottley, S. (2026). America's semiconductor facilities are being built: speciality chemical supply, Speciality Chemicals Magazine, June 1, 2026, contributed by Maine Pointe. https://www.specchemonline.com/news/feature-article-americas-semiconductor-facilities-are-being-built-speciality-chemical-supply
  • SiliconANGLE. (2024). TSMC begins mass-producing chips at newly opened fab in Japan, Maria Deutscher, December 27, 2024. https://siliconangle.com/2024/12/27/tsmc-begins-mass-producing-chips-newly-opened-fab-japan/
  • Solvay. (2026). Consistency becomes non-negotiable across global semiconductor fabs, August 26, 2026. https://www.solvay.com/en/article/consistency-becomes-non-negotiable-across-global-semiconductor-fabs
  • TSMC. (2025). TSMC Intends to Expand Its Investment in the United States to US$165 Billion to Power the Future of AI, press release, March 4, 2025. https://pr.tsmc.com/english/news/3210

Product and site consultation

Leave your company, site and the product groups in use. Our engineer will get in touch to go through your site conditions and concerns. Materials, equipment, operating conditions and downstream steps show what should change and what can stay. If nothing needs to change, we will say so.

Contact us
After you contact us
  1. 01
    Site setup

    We confirm process conditions and needs first.

  2. 02
    Spec design

    We set the product spec and selection criteria.

  3. 03
    Comparison

    We compare matching candidates and propose.

  4. 04
    Tailored supply

    We supply on time and manage the stock.

  5. 05
    Site check

    We visit, check conditions of use and record.

  6. 06
    Use management

    We track use and change cycles to catch issues.

  7. 07
    Regular analysis

    We analyze the records and send a yearly report.