Whether chemical stock protects the line depends less on how many pails sit in the warehouse than on how fast the line uses them and on resetting replenishment rules to that pace. A supply that sets the warehouse reorder point and the line-side quantity separately from line-level consumption records, adjusted for season and the production plan, and carries that pace into the supplier's own replenishment, cuts both stockouts and idle stock.
Background
One Friday morning I got a call that the conveyor through the paint line's drying oven had stopped on a low-level alarm from the chain lubricator, and I went to the plant. Both pails of chain oil on the lubrication cart beside the line were empty. Yet the materials warehouse held more than twenty pails of the same chain oil. The system stock was right, and so was last month's count. The line stood for a while as we refilled the lubricator from a warehouse pail.
The cause was three numbers out of step. The warehouse issued to the line once a week, on Monday, topping the cart up to two pails. And for a month the line had been running two hours of overtime every weekday. With the longer run time the chain oil went faster, and the two pails filled on Monday no longer lasted to Friday morning, yet the quantity and the day were still set for the days before overtime.
The warehouse numbers could not show this shortfall. Working in logistics, I have come to see that whether chemical stock protects the line is decided less by how many pails sit in the warehouse than by how fast the line uses them and by resetting replenishment rules to that pace.
Stock that runs out first beside the line
A plant's chemical stock sits in two places. Pails in the materials warehouse are in the system and counted at every month end. The lubrication cart beside the line, the pail decanted under a machine and the small packs on a workbench are usually booked as consumed the moment they are issued. So the usage the system reports is really issue quantity, and the pace at which the line actually uses stock is not recorded anywhere.
A line stops not when the warehouse runs empty but when the line side does. The warehouse keeper makes sure the warehouse does not run empty and the line makes sure the cart does not, but in many plants no one sets the issue interval and quantity between them to match usage. A line that has had one stockout goes the other way, taking a few extra pails and standing them behind the machine. The system already counts them as used, so the warehouse looks empty while stock hides on the line, and the next order comes out larger than real need.
The trip from warehouse to line side is also a leg of lead time. In a plant that issues once a week, a pail that arrives at the warehouse can take up to seven more days to reach the line. Those seven days are covered by the line-side quantity, not the warehouse reorder point. Count one leg in both places and the stock you meant to cut goes up instead.
The usual way to drop the fixed day is the two-bin system. If sending the first empty pail back to the warehouse is the issue request, the pace of use becomes the issue interval. The second pail only has to last while the empty goes to the warehouse and a full one comes back. That plant had a rule for returning empties too, but the empties went back only with the Monday issue. Tie the round trip to a weekday and two bins turn back into a weekday issue.
Usage records that set the next order
When a convenience store owner orders tomorrow's lunch boxes and drinks, they look at the sales record before the back room: how many sold on the same day last week, tomorrow's weather, events nearby. For a plant's chemicals, the sales record is line-level usage, the weather is the season and the events are the production plan. But the owner's sales record piles up on its own at the till, while a plant's usage is lost unless someone writes it down. Stock control starts with whoever fills the cart writing one line with the date and the amount added.
Where line-level usage is kept differs by plant. Some keep it in the refill log written each time the cart is filled, others in the lubrication checklist for each machine. Maintenance items pulled out once or twice a year can be held at one minimum quantity. But oil like drying-oven chain oil, which the lubricator sprays in a set amount on every chain cycle and which evaporates or drips off at high heat and is never recovered, goes down almost in proportion to run time. So I divide the refill log by run hours over the same period and turn it into liters per 100 run hours. Then next month's run plan tells you usage in advance.
If a plant has no refill log, weigh the pails on the cart at the same time every day for two weeks and count the pails under the machines too. Add what was issued in between to what went down in a day, and you get what the line really used. Two weeks show how far the issue ledger is from actual use.
A supplier that sees only orders does not know this number. Customer orders bunch up around month ends and quarterly budgets. Batching orders alone makes demand as the supplier sees it swing far more than real use, as supply chain research has long shown (Lee et al., 1997). When overtime or weekend shifts start, a supplier that sees only orders learns of the change from the big order that follows the first stockout. The lead time a supplier promises also assumes the item is in its warehouse, and that warehouse's reorder point was set by the customer's old order pace. I too have misread usage from order records.
Season and production plan move usage first
An average over the last few weeks always lags in the month the season turns. For forecasting seasonal numbers, the first benchmark is the value for the same period last year (Hyndman & Athanasopoulos, 2021). In some plants, shipments of rust preventive oil for parts rise as humidity climbs in the rainy season, and usage drops in months with year-end shutdowns and Lunar New Year holidays.
For season, divide last year's usage in the quarter matching next quarter by last year's usage in the quarter before it, and multiply the last 13-week average by that ratio. In the first year, with no record from last year, leave it uncorrected but raise safety stock a little in the months the season turns.
The production plan moves before usage records do. Overtime, weekend shifts, new-model launches and scheduled maintenance all go on production control's plan weeks ahead. Yet the news usually reaches the materials warehouse after usage has already changed. The weekday overtime behind that Friday morning had been on the plan for weeks before it started.
Some things I cannot judge. If usage rises with nothing new in the plan, before raising the reorder point I first ask the maintenance foreman about leaks or the lubrication interval setting. Higher usage may be a fault rather than demand, and that is for maintenance and engineering to sort out, not logistics.
Putting it to work
Let me set a reorder point for one paint line that takes chain oil in 20-liter pails. Start with the consumption record. Say the cart refill log for the past 13 weeks, summed by week, averages 1.6 pails, with a weekly standard deviation of 0.2 pails. Next come season and plan. If last year's usage in those two quarters was about the same, the ratio is near 1, so there is no seasonal correction. If next quarter's plan adds two hours of weekday overtime and run time rises by a quarter, weekly usage becomes 2 pails and the swing rises in the same proportion to 0.25 pails.
Then comes lead time by leg, and each leg is covered by different stock. On the warehouse side, three days for purchase approval, nine for supplier lead time and two for incoming inspection make 14 days, or two weeks. Two weeks of use is 4 pails. If weekly swings are independent, the swing over two weeks is 0.25 pails times the square root of 2, about 0.35 pails. When lead time is nearly fixed, as with domestic delivery, multiplying by 1.65, the factor for a 95% chance of avoiding a stockout, gives safety stock of about 0.6 pails (Silver et al., 2017). So order when warehouse stock right after the Monday issue is five pails or fewer. On pre-overtime numbers it was 3.2 pails plus about 0.5 of safety stock, or four pails. Left in place, that rule equals exactly two weeks of use with no safety stock, so one time in two the warehouse runs empty before new pails arrive.
The seven days waiting for the issue stay out of this calculation and fall to the line-side quantity. If the cart is filled to that quantity every Monday, it is one week's 2 pails plus about 0.4, which is 1.65 times 0.25, for 2.4, rounded up to three pails. Two pails equal exactly one week of use, so every other week the cart runs empty before the next Monday. Before overtime, 1.6 pails plus about 0.3 made two, which was right. If there is no room for three pails by the machine, splitting issues to twice a week is better. Three and a half days is 1 pail plus about 0.3, or 1.3, so two pails on the cart will hold.
If materials staff count the pails beside the line at the next stock count and write them next to the warehouse numbers, hidden stock and short lines show up at once. If you are in purchasing, ask your supplier whether, instead of one line on lead time, they can take line-level usage and plan changes and redo this calculation with you.
The plant knows its own line's pace, and the supplier knows its warehouse and the raw material receipts and production schedule behind it. Only when the two numbers meet does a nine-day lead time stay nine days after overtime begins. Where I work, we keep reading each customer's usage data after delivery, and when the usage trend crosses a baseline, we put that trend into our own replenishment plan and match our warehouse to the new pace before the customer's next order arrives. In months when we hear of production plan changes in advance, we reset reorder points and delivery schedules with the customer, and every quarter we recalibrate this calculation against the customer's refill logs.
Conclusion
The pail count in the warehouse is the result of past orders; the line's usage is a warning of the next stockout. Count the reorder point from how fast the line uses stock, not from the pails in the warehouse. Stock protects the line when you count the days the warehouse covers and the days the line side covers separately, and carry that pace in the same numbers through to the supplier's warehouse.
Plants now see more weekend shifts and model changes, along with demands to cut stock. When the two overlap, a plant that squares its numbers at the month-end count swings between stockouts and idle stock.
With overtime, the reorder point goes from four pails to five and the cart quantity from two to three.
Sources
- Hyndman, R. J., & Athanasopoulos, G. (2021). Forecasting: Principles and practice (3rd ed.). OTexts.
- Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43(4), 546–558.
- Silver, E. A., Pyke, D. F., & Thomas, D. J. (2017). Inventory and production management in supply chains (4th ed.). CRC Press.