At a forging plant's annual contract renewal, purchasing, production and logistics each name a different release agent volume for next year, and what sends people back to the contract during the year is actual volume falling outside those numbers or supply stopping. Writing the volume band, the notice period for a supply stop, the conditions for reopening price and the scope of force majeure into clause wording before signing settles the cost and the basis of allocation for that day in advance.

Background

At one forging plant's annual contract renewal meeting, when the question was next year's volume of water-based graphite release agent, three people gave three numbers. The buyer took this year's actual orders and added the budget growth rate. The production planner multiplied next year's press stroke plan by the usage per stroke. The logistics lead counted backward from how many totes fit in the warehouse that is heated in winter. The largest and smallest numbers were quite far apart.

The meeting usually writes one of them into the contract as the expected volume and moves on to price. The price is fixed for an agreed period, but what sends people back to the contract during the year is actual volume going outside those three numbers, or supply stopping. In an annual contract, four clauses cover the times things go wrong: the volume band, the notice period for a supply stop, the conditions for reopening price and the scope of force majeure. Before signing, check whether the spread between the three numbers is in the contract, and whether the wording says who bears the cost and the volume on the day supply stops.

A volume band that covers all three numbers

Release agent usage at a forging plant swings widely. The concentrate is diluted with water and sprayed onto the dies, so at the same stroke count the dilution ratio alone changes how much concentrate you use. For example, going from 1 part concentrate in 10 parts water to a richer 1 in 8 raises the concentrate share from one eleventh to one ninth and increases concentrate use by more than 20%. When vehicle orders change every quarter, the stroke plan itself moves too.

So instead of one line of expected volume, write a range. Put the smallest number from the meeting at the low end and the largest at the high end, and trade at the same price in between. What the buyer gets for committing to the low end is the supplier's duty to deliver up to the high end at the same price.

Some contracts charge for volume not bought below the low end by multiplying the shortfall by the unit price, but I think that number is larger than the real loss. The cost the supplier actually bears for that volume is the stock it brought in for that customer sitting unused and being thrown away. Graphite dispersions settle over time and have a shelf life. If leftover stock is hard to move to other customers within that life, that share grows, and if it is easy to move, it shrinks. So I propose writing the shortfall as the value of the stock brought in ahead that cannot be moved elsewhere within its shelf life.

There is a value in the other direction too. If the supplier cannot deliver volume inside the band, the buyer buys elsewhere in a hurry, and a price difference and express freight follow. The loss on a day a press stops because release agent ran out is easily treated as damage from special circumstances, and the buyer is compensated only by showing the supplier knew or could have known of those circumstances (MOLEG, n.d.-b). So the band clause should say whether the supplier bears only the price difference and freight, or also the loss from a stopped line.

The band also becomes the threshold for reopening price. If quarterly purchases, annualized, stay outside the band for two quarters in a row, the price is no longer a price set for that volume. Write a condition to review the price and the band together at that point, and reopening starts on the day a preset number is crossed, not on the day one side can no longer hold out. A formula that adjusts price to a raw material index and exchange rates sits in a separate clause.

Days of notice for a supply stop, and the volume in between

The notice period should come from how many days the plant needs to move to a different release agent. A new release agent goes on the line only after trial strokes on a few sets of dies, resetting spray nozzles and dilution ratios, and watching part surfaces and die life. For a vehicle supplier, the quality team first checks whether a release agent change requires a 4M change notification, and adds the days until approval. At a plant where this takes three months, a 30-day notice clause leaves two months blank.

Notice should cover not only discontinuation and production stops but also cases where the product name stays the same while the graphite raw material, formulation or production site changes. The volume after notice must be written too. Only when the contract states that volume inside the band keeps coming at the same price after notice does the notice period become a real changeover period. If there is a final bulk purchase, for a water-based release agent that has to be kept from freezing, the number of totes the logistics lead counted in the heated warehouse is the upper limit of that amount.

The basis of allocation on the day force majeure is declared

Under the Civil Act, a debtor who becomes unable to perform without intent or negligence is not liable for damages (MOLEG, n.d.-a). A force majeure clause writes down in advance which circumstances count as nonperformance without fault. The International Chamber of Commerce's 2020 model clause lists war, trade restrictions and sanctions, government orders, epidemics and natural disasters, fire and destruction of equipment, prolonged breakdown of transport and energy, and general strikes as events presumed beyond control and unforeseeable without separate proof. It also advises removing items that do not fit the contract, such as export restrictions (ICC, 2020).

A buyer should look at two lines first. One is about the parties the supplier hands work to. The same model clause accepts nonperformance by a third party entrusted with all or part of the contract, a contract manufacturer for example, only when the force majeure conditions are also met for that third party (ICC, 2020). I ask for the same line for raw material suppliers and the manufacturer. If the force majeure grounds list supplier nonperformance broadly and this line is missing, a problem at one source becomes a reason to stop supply outright. The other is the accounting while the impediment lasts. The model clause lets either party end the contract if the impediment lasts more than 120 days (ICC, 2020). The contract should also say whether volume the buyer bought elsewhere during that time counts toward the low end of the band.

What is most often left blank is allocation when supply shrinks. Force majeure more often comes as a partial cut than a complete stop. The US Uniform Commercial Code requires a seller whose capacity is only partly blocked to allocate among customers in a fair and reasonable way and to notify buyers of their expected quota in time (ALI, n.d.). If a contract has no allocation basis, the supplier sets it on the day. Choose in advance whether to divide by share of the previous twelve months' purchases or by the low end of the band. For a plant whose volume is growing, the low end works better than last year's record. Write down within how many days quotas are announced as well, and allocation is set by the wording on the day you signed, not by a phone call on the day.

Putting it to work

For a plant whose three numbers came out as 48, 60 and 72 totes, the four clauses read like this. The volume band: "The buyer will purchase no less than 48 and no more than 72 totes of concentrate during the contract term, and the supplier will supply within that range at the same unit price. If actual purchases fall short of 48 totes, the buyer pays the value of stock the supplier brought in for this contract that cannot be moved elsewhere within its shelf life. If the supplier cannot fill orders within the range, the supplier bears the price difference and freight the buyer incurs buying elsewhere, and bears line stoppage losses up to a separately agreed limit." The heated warehouse tote count the logistics lead gave as the basis for that number is written separately from annual volume, as the maximum per delivery.

Notice of a supply stop: "The supplier will give written notice at least 120 days before the effective date of any discontinuation, production stop, or change of raw material, formulation or production site, together with test reports from before and after the change. Until the effective date, the supplier will supply volume within the range at the same unit price."

Price reopening sets out the conditions for a request. "If quarterly purchases, annualized, are outside the range for two quarters in a row, either party may request renegotiation, and if supply is reduced for more than 30 days, the buyer may. If no agreement is reached within 30 days, either party may end the contract with 120 days' notice, and until then the supplier will supply volume within the range at the existing price. On termination, the low end of the purchase range is reduced in proportion to the elapsed term." If termination notice is shorter than supply stop notice, the 120 days in the earlier clause leak out through this line.

The scope of force majeure: "Nonperformance by a third party the supplier has entrusted with performance, a raw material source or the manufacturer counts as force majeure only when the same conditions are met for that party. If supply is reduced, the supplier allocates by share of the previous twelve months' purchases and announces quotas within 7 days, then again whenever they change. Volume the buyer buys elsewhere during that time counts toward the low end of the purchase range."

For a distributing supplier to keep these four clauses, its own contract with the manufacturer must carry the same or longer day counts and the same wording. If the manufacturer contract gives 60 days of notice, the remaining 60 days pass to the buyer. So a supplier who arrives with the top of the band, the notice days and the allocation basis already written as clauses is one who has already matched them against its own upstream contract. The question for the buyer is whether that upstream notice period is longer than these 120 days. I bring a draft of the four clauses to the renewal meeting first, and rewrite it with the three people's numbers.

Conclusion

The price in an annual contract is the value when everything goes as expected. Where volume will land in the range, what volume not bought is worth, and on the day supply stops how many days you gain and who gets how much are not in the price table, only in the four clauses. From where I sit, setting the width of the band is moving from the buyer alone to a renewal meeting where production planning and logistics sit at the table too.

What the buyer should check is that all four clauses are filled in with no blanks.

Sources

  • American Law Institute [ALI] & Uniform Law Commission. (n.d.). Uniform Commercial Code § 2-615, Excuse by failure of presupposed conditions. Legal Information Institute, Cornell Law School. Accessed November 2026. https://www.law.cornell.edu/ucc/2/2-615
  • International Chamber of Commerce [ICC]. (2020). ICC force majeure and hardship clauses. March 2020. https://iccwbo.org/wp-content/uploads/sites/3/2020/03/icc-forcemajeure-hardship-clauses-march2020.pdf
  • Ministry of Government Legislation [MOLEG]. (n.d.-a). Civil Act Article 390, Nonperformance of obligations and damages. Korean Law Information Center. Accessed November 2026.
  • Ministry of Government Legislation [MOLEG]. (n.d.-b). Civil Act Article 393, Scope of damages. Korean Law Information Center. Accessed November 2026.

Product and site consultation

Leave your company, site and the product groups in use. Our engineer will get in touch to go through your site conditions and concerns. Materials, equipment, operating conditions and downstream steps show what should change and what can stay. If nothing needs to change, we will say so.

Contact us
After you contact us
  1. 01
    Site setup

    We confirm process conditions and needs first.

  2. 02
    Spec design

    We set the product spec and selection criteria.

  3. 03
    Comparison

    We compare matching candidates and propose.

  4. 04
    Tailored supply

    We supply on time and manage the stock.

  5. 05
    Site check

    We visit, check conditions of use and record.

  6. 06
    Use management

    We track use and change cycles to catch issues.

  7. 07
    Regular analysis

    We analyze the records and send a yearly report.