Why chemical costs at semiconductor and battery plants are set at approval

Type
Kaltec Voices
Published
24 November 2026
Prepared by
Unjung Kim
Role
Operations Staff

Approval at semiconductor and battery plants binds a chemical to its supplier, production site and purification method for years, and every time one of them changes, the costs of testing, paperwork and waiting stock come back. For a long-running item like recycled NMP at a cell plant, the size of a requalification depends on how well the lot records connect to the baseline values set at first approval.

Background

Last year, several totes of recycled NMP stood in a corner of our warehouse for weeks. It was a recycling supply: solvent recovered from a battery cell plant, distilled and sent back. The plant doing the purification had moved its distillation unit to a new site, and lots from the new site were outside the customer's approval scope. The analysis values were no different from earlier lots. Even so, the cell plant's quality lead said they could take them only after coating tests and cell evaluation were redone on lots from the new site. In the meantime, the cell plant bought virgin NMP to keep the line running. That price difference, the storage fees for the totes and the resubmitted paperwork were money that appeared in no one's quote.

At semiconductor and battery plants, choosing a process chemical means getting it approved. An approval binds not one product name but the supplier, the production site and the purification method it comes from, and if even one of those changes, the tests and paperwork are done again. At these plants, the cost of one chemical is the sum of the first approval, the yearly cost of keeping it approved and the cost of requalification, and how large requalification grows is largely set on the day of the first approval.

A solvent that leaves the plant and comes back

Cathode slurry is made by dissolving the binder PVDF in NMP. NMP driven off in the drying oven is recovered from the exhaust by condensing it or absorbing it into water, and the recovered liquid goes through distillation at a purification plant and back to the cell plant. Drying and solvent recovery take large equipment and a lot of energy, and one analysis found that switching the solvent to water could cut that process cost by up to half (Wood et al., 2018). Still, many cathode lines use NMP. Recycled NMP comes in at a lower price per kg than virgin, and the money spent on approval has to be paid back out of that price difference.

A cell plant taking recycled NMP looks at purity and water, decomposition byproducts formed in distillation, amines and metal ions. NMP absorbs water readily, so its water content rises even in storage, and a wet solvent unsettles slurry viscosity and, in high-nickel cathodes, hastens the binder setting into a gel. A single purity number does not capture the byproducts, amines and trace metals, and those values follow the distillation unit and its operating conditions. So two recycled NMPs of the same purity are different solvents to the customer, depending on which unit made them under what conditions. When a recycling supply makes up recovery losses with virgin NMP, the maker of that top-up NMP is also bound into the approval documents. Even under the same name, an approval does not carry over to a different grade. NMP used to strip photoresist in a semiconductor fab is a grade that touches wafers, so metal impurities are checked to far lower levels, and it is approved separately from the battery grade.

The months of a first approval, and what they cost

A first approval for recycled NMP usually starts with the certificate of analysis and sample analysis, moves on to making slurry to check viscosity and coating, and ends with test cells going through formation and life testing. Even if the first two steps finish in weeks, life testing takes months, because it repeats hundreds of charge and discharge cycles.

The money spent in this period is the coating line time given over to testing, the months spent building test cells and occupying channels on cycling equipment, and the time quality and process engineering staff put into review. On the supply side, it costs samples and analysis, approval documents, and holding stock made under the same conditions as the test lots until approval is done. Stock waiting on approval does more than take up warehouse space. The solvent absorbs water, so totes that have stood a long time need their water measured again before they ship.

The first approval goes on the books as money paid once and done, but parts of the same testing come round again with every requalification. The cost of approval recurs across the years the item is in use.

The cost of keeping an approval and of earning it again

Some costs come every year after approval. Plants making automotive cells often follow the auto industry's quality management system. That system builds second-party audits, in which the customer visits the supplier directly, into supplier management (IATF, 2016). To be ready for one audit day, the purification plant's process control records, lot certificates and analytical instrument calibration records have to be bundled again. For a customer with a cell plant in Europe, NMP is a restricted substance under REACH. Since May 2020, exposure limits of 14.4 mg/m³ by inhalation and 4.8 mg/kg per day by skin must be written into the chemical safety report and the safety data sheet. Worker exposure must also be kept below them (European Commission, 2018). Every time those documents are revised, the customer's papers change with them, and the quality staff's time spent checking certificates lot by lot also falls in this share.

Korean suppliers often call a change that triggers requalification a 4M change, and semiconductor fabs receive the same thing as a supplier change notification. The automotive part approval process lists moving production to another or an added plant, changing the source of materials or services, and using material different from that at approval as changes to notify the customer of and get approved again. There is also a separate appendix just for bulk materials such as chemicals (AIAG, 2006). For recycled NMP, these include a change of the purification plant that receives the recovered liquid or of the maker of top-up virgin NMP, a change of purification method such as the number of distillation stages or the vacuum conditions, and the distillation unit moving to a new site.

How large a requalification becomes depends on how narrowly you can show what the change actually changed. If years of lot analysis values can show that lots from a new site fall inside the same range as lots from the old one, the customer may finish requalification with analysis and coating tests and shorten life testing. The lots in the totes standing in the warehouse had no such thing. There were a few sheets of analysis from the new site, but no record that could be laid side by side with a lot history running from the values at first approval.

That is why the cost of requalification is largely set on the day of first approval. The analysis values recorded that day become the baseline every later change is measured against, and that day is also when you choose whether the supply will keep recording values lot by lot against that baseline, with the same items and the same test methods.

Putting it to work

Pick one item you use under approval now, and add up again what it has cost from the day of first approval to today. An item that has run on the same supply for several years, like recycled NMP, works well.

First approval. Ask quality and process engineering staff for the coating line time given to testing, the number of test cells and months of cycling equipment they occupied, and the staff time spent on review, and write them down. Ask the supply side what samples, analysis and documents cost, and keep that alongside.

Yearly upkeep. Write down, year by year, the days spent on supplier audits, the time spent checking lot certificates, and the time spent keeping up with revisions to safety data sheets and regulatory documents.

Requalification. Gather the change notifications of the past few years and sort the reasons into supplier, purification method and production site. For each one, write down the steps redone and the days they took, the price difference of covering with virgin or another supply in the meantime, and the storage cost of stock waiting on approval.

The sum of the three is money already spent, so it does not go straight into deciding whether to switch suppliers now. Of the three, the first approval line is the data for estimating what one new approval would cost. Whether to switch is decided by comparing that estimate, divided by the volume to be used after switching, with the price difference per kg. Looking back over past requalifications also gives the range of that estimate. Compare where the cases ended that had years of lot analysis before and after the change side by side, and where the cases without it ended. If the cases with it ended earlier, then when approving a new supply, write next to the per-kg price whether it is a supply that will keep the lot record going against the analysis values from first approval.

Conclusion

An approval binds an item, together with its supplier, production site and purification method, for years, and whenever one of those changes, the same tests and paperwork repeat. The cost of the first approval is paid on the way to approval, and the size of every requalification after it is set by how well the lot records connect to the baseline set that day. In a year when the per-kg gap between recycled and virgin narrows, one requalification eats several years of that gap.

When a change notification comes in from the purification plant, the first thing I open is that item's analysis values from first approval.

Sources

  • Automotive Industry Action Group [AIAG]. (2006). Production part approval process (PPAP) (4th ed.). AIAG.
  • European Commission. (2018). Commission Regulation (EU) 2018/588 of 18 April 2018 amending Annex XVII to Regulation (EC) No 1907/2006 as regards 1-methyl-2-pyrrolidone. Official Journal of the European Union, L 99, April 19, 2018.
  • International Automotive Task Force [IATF]. (2016). IATF 16949:2016 Quality management system requirements for automotive production and relevant service parts organizations. IATF.
  • Wood, D. L., Quass, J. D., Li, J., Ahmed, S., Ventola, D., & Daniel, C. (2018). Technical and economic analysis of solvent-based lithium-ion electrode drying with water and NMP. Drying Technology, 36(2). https://doi.org/10.1080/07373937.2017.1319855

Product and site consultation

Leave your company, site and the product groups in use. Our engineer will get in touch to go through your site conditions and concerns. Materials, equipment, operating conditions and downstream steps show what should change and what can stay. If nothing needs to change, we will say so.

Contact us
After you contact us
  1. 01
    Site setup

    We confirm process conditions and needs first.

  2. 02
    Spec design

    We set the product spec and selection criteria.

  3. 03
    Comparison

    We compare matching candidates and propose.

  4. 04
    Tailored supply

    We supply on time and manage the stock.

  5. 05
    Site check

    We visit, check conditions of use and record.

  6. 06
    Use management

    We track use and change cycles to catch issues.

  7. 07
    Regular analysis

    We analyze the records and send a yearly report.