BlogKaltec Voices
Why a good quote states its terms before its price
- Type
- Kaltec Voices
- Published
- 24 November 2026
- Prepared by
- Unjung Kim
- Role
- Operations Staff
Only a quote that puts pack size, delivery terms, minimum order, price validity and payment terms above the unit price shows what the price is for, and so can be set beside another quote. Of those, the minimum order for a dangerous good cannot be kept by looking at one item in a plant where several items, such as a release agent and a heat-transfer oil, share one storage's designated-quantity multiple, so it needs terms that set the volume and order of deliveries across the items in that storage.
Background
A buyer at a customer emailed me. They had quotes from two suppliers for a solvent-based release agent sprayed on moulds, and the price per kg came out the same. They had to submit for approval next week and asked if we could adjust a little; we were one of the two. Instead of changing the price, I sent our terms back, rewritten line by line above the unit price: to what point it is delivered, in what container, how many units per order at minimum, how long it holds and when it is paid. I added that they could line up the other quote the same way. A few days later the buyer told me what they found: on every line above the unit price, the two quotes stated different terms.
Given two package tours at the same price per person, anyone who has traveled reads what is included and what is not first. Chemical quotes have no fixed place for that, so the exclusions sit in a different spot with each supplier, or are left out altogether.
A unit price is a number you can read only once the terms above it are set. Two prices on different terms are the same number, not the same price, and a good quote states its terms before its price, saying first what the price is for. Of the five lines, the one a supplier cannot fill alone is the minimum order. For a release agent that is a dangerous good, the minimum order has to fit the limit left in the customer's storage, and that limit is shared with other items in the same storage, such as heat-transfer oil. Where several items share one limit in a storage, the terms hold only when they are set across the items together.
A price to restate when the container changes
A release agent's price per kg differs between an 18 L can and a 200 L drum, because the smaller the container, the more container cost and filling work each kg carries. So if one supplier quoted the same price on cans and the other on drums, the can quote is in effect the lower one. If the container is filled by the liter but the price is per kg, you work out the weight of one container from the density on the data sheet to get the price per container. At a density of 0.7, one 200 L drum of release agent is 140 kg.
When pack size is missing from the request for quotation, each supplier prices in the container that suits it, and the comparison sheet mixes prices for different containers in one column. Such a sheet has to be rewritten in two columns, price per kg and price per container, before the figures sit side by side. For a dangerous good, the container also ties into the storage count. If one drum of an item reaches the designated quantity, whether to take drums or cans is a question the storage answers first.
Delivery terms that "delivered" alone does not cover
The delivery terms common in Korean domestic quotes are loaded at origin and delivered. A loaded at origin price ends when the goods are loaded onto the customer's truck at the supplier's warehouse; a delivered price includes freight to the customer's plant. But "delivered" alone is not enough. Even within one plant, the truck and unloading equipment differ depending on whether goods come off at the main gate or in front of the dangerous goods storage.
Only the plant's people know whether a large truck can reach the storage and whether there is a forklift. So when quoting a release agent or heat-transfer oil classed as a dangerous good, I first ask for the unloading point, the truck size that can get in and the unloading equipment, along with the delivery address, and write the answers above the price. When someone without handling qualifications unloads, the dangerous goods safety manager must take part (MOLEG, n.d.-f), so one line stating which plant, which storage, whose forklift and what time leaves nothing to argue over at the unloading bay on the first delivery.
Where delivery ends is also where the risk of loss or damage passes to the customer. If a drum is dented or leaks during unloading, who bears that loss rests on this one line. Incoterms, the delivery terms used in trade, also separate DAP, handed over on the truck, from DPU, handed over once unloaded (ICC, 2019).
Items that share one storage's limit
Korea's Enforcement Decree of the Dangerous Substances Safety Management Act classes flammable liquids by flash point at one atmosphere. Below 21 °C is Class 1 petroleum, 70 °C to under 200 °C is Class 3 and 200 °C to under 250 °C is Class 4; the designated quantity is 200 L for water-insoluble Class 1, 2,000 L for water-insoluble Class 3 and 6,000 L for Class 4 (MOLEG, n.d.-a). A release agent dissolved in a solvent such as heptane, whose flash point is around minus 4 °C, is Class 1 if its safety data sheet gives a flash point below 21 °C. Some mineral-oil heat-transfer oils have flash points around 200 °C, so the item name alone does not tell Class 3 from Class 4; you have to read the flash point on the safety data sheet.
For a Class 1 release agent, one 200 L drum is the designated quantity, and dangerous goods at or above the designated quantity may be kept only in a licensed storage (MOLEG, n.d.-b). Class 1 petroleum with a flash point below 0 °C may not be kept in an outdoor storage either (MOLEG, n.d.-e). For a plant without a licensed storage, a minimum order by the drum is a term it simply cannot accept. Smaller quantities are governed by the ordinance of the province or city where the plant sits (MOLEG, n.d.-c). Daegu's ordinance, for example, treats a fifth of the designated quantity or more as small-quantity dangerous goods (Daegu Metropolitan City, n.d.), so for a Class 1 release agent the line is 40 L, and three 18 L cans cross it.
When two or more dangerous goods are kept in one place, each item's quantity is divided by its own designated quantity, the results are added, and a sum of 1 or more counts as at or above the designated quantity (MOLEG, n.d.-b). In this count one drum of Class 1 release agent is 1 times, and one drum of Class 4 heat-transfer oil is a thirtieth. One drum of release agent uses as much of the limit as thirty drums of heat-transfer oil. A licensed storage has a set quantity per substance and an overall multiple, so the items inside share one limit. Moving the heat-transfer oil's share to the release agent needs a change notice filed at least a day ahead (MOLEG, n.d.-d).
The two items also arrive at different rhythms. The release agent comes in steadily with the number of moulding shots, while heat-transfer oil usually arrives only as top-up, until a decision to replace the system's oil brings many drums at once. Twenty drums of heat-transfer oil is 4,000 L: two thirds of the multiple as Class 4, or 2 times as Class 3. Drums of used oil drained from the system also sit in the storage until they are disposed of. Set the release agent's minimum order by looking at the release agent alone, and in the month the oil is changed the storage total can exceed its licensed multiple. In such a month the terms for both items have to be written on one schedule, for example splitting the release agent delivery in two or holding it until the new oil is in the system. The number on the minimum order line can be set only once you know the licensed multiple, what is already in the storage and the large deliveries coming up.
A price good until when, and paid when
Price validity is also a line above the unit price. A price "fixed for 90 days from the quote date" has an end date written on it; a price "to be discussed if raw material prices change" does not.
Payment is a line delivery terms do not fill. Incoterms too only set delivery and the split of risk and cost, and do not cover price or payment (ICC, 2019). Between a price paid in cash on delivery and one closed at month end and paid 60 days later lies money the supplier fronts for two to three months, depending on the delivery date. Whether it is cash or a promissory note, and whether VAT is extra, belong on the same line so the cost accountant can work it out in one place. I write the closing date, payment date and payment method separately above the unit price.
Putting it to work
Let me lay the two quotes from that first email side by side again. With our quote on the left and the other on the right, draw five lines above the price in the same order, container, delivery, minimum order, price validity and payment, and copy each quote's wording onto them. Our quote form puts these lines above the price for exactly this, to line up with the quote beside it. If either side leaves a line blank, send it back to be filled, and do not compare prices until it is.
Each line is matched differently. If the container line splits into cans and drums, restate both quotes as price per kg and price per container. Match the delivery line by where the price ends, in front of which storage and with whose forklift; if one side stops at the main gate, add the work of moving goods to the storage to that quote. Write the price validity and payment lines as dates, the end date and the payment date. Put these five lines in the purchase approval alongside the price, and if terms change after the order you can point to what changed.
The line that takes longest is the minimum order. Beside each quote's minimum order, write the multiple that amount takes up in the storage, and below it the multiple already used by heat-transfer oil and other dangerous goods in the same storage, plus large deliveries due in the next three months. A quote whose total exceeds the licensed multiple cannot be taken as it stands, whatever its price, so ask again for terms with a split delivery schedule or a delivery order with the other items. Only once this line is matched do I add freight, container cost and empty container return, restate each as a delivered price per kg, and compare the two numbers for the first time. By then you can also see which quote filled that line with the storage's other items counted in.
Conclusion
In a plant where a release agent and heat-transfer oil share one storage, one item's minimum order meshes with the other's delivery schedule. That meshing does not show in the unit price on a single quote; it shows in terms that state the remaining multiple and the delivery order. Where a request came with the storage's licensed multiple and its current contents already written in, I filled the minimum order line to fit that multiple in my first reply. The more dangerous goods a plant takes on, the more often its quotes will be built together, one storage at a time.
If the minimum order line above the price shows that your storage's remaining multiple was counted, that quote states terms your plant can actually keep.
Sources
- Daegu Metropolitan City. (n.d.). Daegu Metropolitan City Ordinance on Dangerous Substances Safety Management, common standards for storing or handling small quantities of dangerous substances. Korean Law Information Center, local laws. Accessed November 2026.
- International Chamber of Commerce [ICC]. (2019). Incoterms 2020: ICC rules for the use of domestic and international trade terms (ICC Publication No. 723E). ICC.
- Ministry of Government Legislation [MOLEG]. (n.d.-a). Enforcement Decree of the Dangerous Substances Safety Management Act, Annex 1, Dangerous substances and designated quantities. Korean Law Information Center. Accessed November 2026.
- Ministry of Government Legislation [MOLEG]. (n.d.-b). Dangerous Substances Safety Management Act, Article 5, Restrictions on storing and handling dangerous substances. Korean Law Information Center. Accessed November 2026.
- Ministry of Government Legislation [MOLEG]. (n.d.-c). Dangerous Substances Safety Management Act, Article 4, Storing and handling dangerous substances below the designated quantity. Korean Law Information Center. Accessed November 2026.
- Ministry of Government Legislation [MOLEG]. (n.d.-d). Dangerous Substances Safety Management Act, Article 6, Paragraph 2, Installation and modification of dangerous substance facilities. Korean Law Information Center. Accessed November 2026.
- Ministry of Government Legislation [MOLEG]. (n.d.-e). Enforcement Decree of the Dangerous Substances Safety Management Act, Annex 2, Places for storing dangerous substances at or above the designated quantity and the classes of storage. Korean Law Information Center. Accessed November 2026.
- Ministry of Government Legislation [MOLEG]. (n.d.-f). Dangerous Substances Safety Management Act, Article 15, Dangerous substance safety manager. Korean Law Information Center. Accessed November 2026.